Concrete Yield Calculator divides the batch weight by the measured unit weight. It reports actual yield, relative yield, cement content, gravimetric air and corrected batch weight.
Enter the batch ticket weights and the unit weight from your ASTM C138 test.
Mix Details
Free moisture is water above SSD. Slag cement runs 2.85 to 2.94; take fly ash from its mill report.
Average of Three Tests
ASTM C94 averages three unit weights, one from each of three loads. Leave these blank for one test.
Corrected Batch Weights
| Material | Batched | Per yd³ | For Design Yield |
|---|---|---|---|
| Cement | 564 lb | 577 lb | 576.9 lb |
| Water | 270 lb | 276 lb | 276.2 lb |
| Fine Aggregate | 1,260 lb | 1,289 lb | 1,288.8 lb |
| Coarse Aggregate | 1,760 lb | 1,800 lb | 1,800.2 lb |
| Total Batch | 3,854 lb | 3,942 lb | 3,942 lb |
Absolute Volumes
| Material | Specific Gravity | Volume | Share of Yield |
|---|---|---|---|
| Cement | 3.15 | 2.87 ft³ | 10.9% |
| Water | 1 | 4.33 ft³ | 16.4% |
| Fine Aggregate | 2.65 | 7.62 ft³ | 28.9% |
| Coarse Aggregate | 2.68 | 10.52 ft³ | 39.9% |
| Air | None | 1.06 ft³ | 4.0% |
| Actual Yield | 2.34 | 26.40 ft³ | 100.0% |
Same Yield in Bags
| Bag Size | Yield per Bag | Bags for This Yield |
|---|---|---|
| 40 lb Bag | 0.300 ft³ | 88 bags |
| 50 lb Bag | 0.375 ft³ | 71 bags |
| 60 lb Bag | 0.450 ft³ | 59 bags |
| 80 lb Bag | 0.600 ft³ | 44 bags |
Concrete Yield Calculator for Batch Tickets
Ready-mixed concrete is batched by weight but sold by volume. The Concrete Yield Calculator turns the weights on a batch ticket into the volume that batch really made.
Enter the cement, water, sand and coarse aggregate weights, the design yield and the measured unit weight. The starting entry is a 3,854 lb batch designed for 1 cubic yard, tested at 146 lb/ft³.
The result reads 0.978 yd³ Actual Yield and 97.77% Relative Yield. That batch is 0.60 cubic feet short of the yard it was sold as.
Four result cards then explain the gap. They show the relative yield, the true cement content, the air in the batch and the batch weight that would fill the order.
The page runs in a phone browser, so it works like a concrete yield calculator app at the truck. Print Results keeps the working as a record of the test.
How to Calculate the Yield of Concrete
Yield is the total weight of everything in the batch divided by the unit weight of the fresh concrete. Dividing by 27 turns cubic feet into cubic yards.
M is the total batch weight in pounds and D is the measured unit weight in pounds per cubic foot. This is the concrete yield formula in ASTM C138, the test named on the result panel.
For the example, 564 lb of cement, 270 lb of water, 1,260 lb of sand and 1,760 lb of coarse aggregate add up to 3,854 lb. Divided by 146 that is 26.40 cubic feet, or 0.978 cubic yards.
Relative yield
Relative yield compares what the batch made with what it was designed to make. A value of 1.00, or 100%, means the order is filled exactly.
Y is the actual yield and Yd is the design yield. Below 100% the batch runs short. Above 100% it over-yields, and each yard holds less cement than the mix design intended.
Yield in cubic meters
Set Units to Metric in the Concrete Yield Calculator and the formula loses the 27. Kilograms divided by kilograms per cubic meter gives cubic meters directly.
The same batch is 1,748 kg at 2,339 kg/m³, which is 0.747 cubic meters. To convert to m3 from feet by hand, divide cubic feet by 35.31, or multiply cubic yards by 0.7646.
One cubic meter is a cube 1 m on each side. It equals 35.31 cubic feet or 1.308 cubic yards, so it is about a third larger than a yard of concrete.
How Yield Is Measured on Site
The unit weight comes from a bucket test. A calibrated measure is weighed empty, filled with fresh concrete, struck off level and weighed again.
Mc is the measure full of concrete, Mm the empty measure and Vm its volume. Choose Bucket Test Weights under Unit Weight From and the Concrete Yield Calculator does this step for you.
The sample entry is a 0.25 cubic foot measure that weighs 7.8 lb empty and 44.3 lb full. That is 36.5 lb of concrete, or 146 lb/ft³.
NRMCA's Discrepancies in Yield describes the routine. Fill the measure in three layers, rod each layer 25 times, tap the sides with a mallet and strike off with a flat plate.
One test is not enough to settle a dispute. ASTM C94 bases yield on the average of three unit weight tests, each from a different truck.
Open Average of Three Tests and enter the unit weights from the second and third loads. With 146, 147.2 and 146.6 the average is 146.6 lb/ft³, and the yield reads 0.974 cubic yards.
What Is a Good Yield?
A good yield is a relative yield of 100%, where the batch makes the volume on the ticket. The Concrete Yield Calculator shows Yield Matches the Design when the two are within 0.5%.
Outside that band the alert reads Underyield or Overyield with the percentage. The example shows Underyield, 2.23% Short.
What a 2% or 6% yield gap means
A 2% underyield means each yard ordered arrives as 0.98 yard. On a 10 yard pour that is 0.2 cubic yards missing, enough to leave 16 square feet of a 4 in slab unpoured.
A 6% gap triples that to 0.6 cubic yards and almost 49 square feet. A gap that large is what a 6% air mix loses if every bit of its entrained air goes missing.
RMC rate per yard actually delivered
Yield also changes what the concrete costs. Divide the price per yard by the relative yield to get the rate for the volume that arrived.
At $150 per cubic yard and 97.77% relative yield, the real rate is $153.42 per yard. On a large pour that difference is worth raising with the producer.
Why a Batch Runs Short
Air is the first thing to check. Entrained air takes up space, so a batch that loses air loses volume by about the same percentage.
The third card in the Concrete Yield Calculator works this out from the specific gravities. In the example the materials weigh 152.09 lb/ft³ with no air, so a reading of 146 means 4.0% air.
The mix was designed for 6% air. At that air content the same weights would make 0.998 cubic yards, so the missing 2 points of air explain nearly all of the shortage.
Shortages that are not the batch
Many yield complaints come from the forms, not the truck. NRMCA notes that a slab poured 1/8 in thicker than a planned 4 in uses 3% more concrete, or 1 yard in every 32.
The same sheet lists form deflection, uneven subgrade, spillage and over-excavation. It also says hardened concrete can be about 2% smaller in volume than it was when fresh.
NRMCA advises ordering 4% to 10% more than the measured volume. The Concrete Calculator gives the measured volume for a slab, and the Concrete Footing Calculator does the same for footings.
How much RMC for 1,000 sq ft
Ready-mix quantity is area times thickness. A 1,000 square foot slab 4 in thick is 333 cubic feet, which is 12.35 cubic yards or 9.44 cubic meters.
At 5 in it is 15.43 cubic yards, and at 6 in it is 18.52. A 20x30 slab at 4 in needs 7.41 cubic yards before the extra allowance.
Correcting the Batch in the Concrete Yield Calculator
The fourth card gives the fix. Design yield times the measured unit weight is the batch weight that fills the order, shown as 3,942 lb Required Batch for the example.
That is 88 lb more than was batched. The card also gives one factor, 1.0228, to multiply every ingredient by so the mix proportions stay the same.
The Corrected Batch Weights panel lists each material three ways. It shows what was batched, what one yard really contains and what to batch next time.
Cement content after the yield check
Cement content is the batched cement divided by the actual yield. The example works out to 577 lb per cubic yard, or 6.14 sacks, against 564 lb in the design.
An underyield makes the concrete richer than designed, and an overyield makes it leaner. The water to cement ratio does not move, and it reads 0.479 here.
The Water To Cement Ratio Calculator covers that ratio on its own. Add fly ash or slag cement under Mix Details and the card switches to cementitious content and w/cm.
Wet aggregate and the w/c ratio
Sand and stone often carry free water on their surface. That water is already in the batch weight, so the yield does not change, but it belongs in the w/c ratio.
Enter it under Mix Details as free moisture above SSD. With 4% on the 1,260 lb of sand, 48 lb moves from sand to water, the w/c ratio rises from 0.479 to 0.565 and the air reads 2.2%.
A full truckload example
NRMCA works an 8 yard load weighing 32,220 lb, with 3,620 lb of cement and 920 lb of fly ash, tested at 151.0 lb/ft³. It reports a yield of 7.9 cubic yards.
Entered in the Concrete Yield Calculator, the same load gives 7.903 cubic yards and 98.79% relative yield. The fix is 396 lb more material, a factor of 1.0123.
Density Figures Behind the Math
Every result depends on a density, so it helps to know which one is which. The Absolute Volumes panel shows the volume each material takes up in the batch.
How many kg is 1 m3 of concrete
It depends on the unit weight you measure. At 146 lb/ft³ one cubic meter weighs 2,339 kg, and NRMCA's example load at 151 lb/ft³ weighs 2,430 kg.
Strength grade does not set the density. An M35 mix has no fixed kg/m³ figure, so measure it with the bucket test like any other concrete.
To find unit weight from a known mass and volume without the yield steps, use the Concrete Density Calculator.
Is the density of cement 1440 or 3150?
Both figures are right, for different jobs. About 3,150 kg/m³ is the density of the cement particles, a specific gravity of 3.15, and that is the one yield math uses.
The 1,440 kg/m³ figure is loose bulk cement, the one used in volume batching tables. In US practice a 94 lb sack counts as one cubic foot, so 1 cft of cement is about 42.6 kg.
The Concrete Yield Calculator opens with 3.15 for cement, 2.65 for sand and 2.68 for coarse aggregate. Replace them with the values on your mill and aggregate reports.
Fly ash and slag cement have their own fields. Slag opens at 2.9, inside the 2.85 to 2.94 range given by the Slag Cement Association.
Fly ash opens at 2.5 as a starting value only. Its specific gravity varies with the source, so take the figure from the supplier's mill report.
Mix Ratios, Grades and Yield
A ratio such as 1:2:4 describes proportions, not volume made. The yield of any ratio still comes from the batch weights and the unit weight, which is what the Concrete Yield Calculator checks.
To turn a ratio into weights first, the Concrete Mix Calculator handles 1:2:4 and other mixes. The Cement Calculator then counts the cement.
M grades and their mix ratios
M grades are the system used in India, where the number is the 28-day strength in megapascals. US mixes are ordered by strength in psi instead, and the table gives both.
| Grade | Mix ratio, cement to sand to aggregate | Strength |
|---|---|---|
| M5 | 1:5:10 | 5 MPa, about 730 psi |
| M7.5 | 1:4:8 | 7.5 MPa, about 1,090 psi |
| M10 | 1:3:6 | 10 MPa, about 1,450 psi |
| M15 | 1:2:4 | 15 MPa, about 2,180 psi |
| M20 | 1:1.5:3 | 20 MPa, about 2,900 psi |
| M25 | 1:1:2 | 25 MPa, about 3,630 psi |
| M30, M35, M40 | Design mix, no fixed ratio | 30 to 40 MPa, about 4,350 to 5,800 psi |
The ratios follow the grade table published by JK Cement. Grades up to M20 are nominal mixes, and M30 and above are proportioned by a mix design.
JK Cement lists 1:4:8 for foundations and mass concrete. For structural members such as an RCC slab, beams and columns, it points to M25 and the stronger design mixes.
Yield of bagged concrete
Bagged mix has its yield printed by the maker. The QUIKRETE Concrete Mix data sheet lists 0.60 cubic feet for an 80 lb bag and 0.45 for a 60 lb bag.
The Same Yield in Bags panel in the Concrete Yield Calculator uses those figures. The 26.40 cubic feet in the example equals 44 bags of 80 lb mix or 59 bags of 60 lb mix.