Soil pipe fall calculator

Updated

Soil Pipe Fall Calculator solves total fall, gradient or longest run for a soil or waste pipe, sets the end invert and trench depths, and checks the slope against IPC or UK Part H.

Pipe Run, Size & Gradient

Measure the run level, along the ground, not along the pipe.

Inverts, Bedding & Flow Check 18 in Start · n 0.013
Total Soil Pipe Fall
10 in Total Fall
= 0.25 in/ft × 40 ft run
1:48 Gradient
Percent Grade2.083%
Fall per Meter20.8 mm/m
The same gradient in the other forms that plans, laser levels and merchants use, so you can set the pipe whatever the drawing says.
28 in End Invert Depth
Midpoint Invert Depth23 in
Trench Base at End32 in
Depth below ground to the inside bottom of the pipe, and the trench depth once the bedding under the pipe is added.
Meets IPC Table 704.1
Code Minimum, 4 in Pipe1/8 in/ft (1:96)
Fall at Code Minimum5 in
IPC Table 704.1 sets the flattest slope by pipe size: 1/4 in/ft to 2-1/2 in, 1/8 in/ft for 3 to 6 in, 1/16 in/ft above.
3.15 ft/s Full-Pipe Velocity
Full-Bore Capacity123 gpm
Half-Full Capacity61.6 gpm
Manning flow for the bore and roughness you set. A half-full pipe moves at the same speed as a full one but carries half the water.
Pipe Fall Profile40 ft run
Fall 10 inStart invert 18 in deepEnd invert 28 in deepRun 40 ft, slope drawn steeper than scalePipe falls toward the outfall
Invert Staking SheetQuarter points
StationDistanceFall From StartInvert DepthTrench Base
Start0 ft0 in18 in22 in
25%10 ft2.5 in20.5 in24.5 in
50%20 ft5 in23 in27 in
75%30 ft7.5 in25.5 in29.5 in
End40 ft10 in28 in32 in
Fall by Distance Chart5 to 100 ft runs
Run1/16 in/ft1/8 in/ft1/4 in/ft1/2 in/ft
5 ft0.313 in0.625 in1.25 in2.5 in
10 ft0.625 in1.25 in2.5 in5 in
15 ft0.938 in1.88 in3.75 in7.5 in
20 ft1.25 in2.5 in5 in10 in
25 ft1.56 in3.13 in6.25 in12.5 in
30 ft1.88 in3.75 in7.5 in15 in
40 ft2.5 in5 in10 in20 in
50 ft3.13 in6.25 in12.5 in25 in
75 ft4.69 in9.38 in18.8 in37.5 in
100 ft6.25 in12.5 in25 in50 in
Code Minimum GradientsIPC Table 704.1
Pipe SizeMin SlopeRatioPercent
2-1/2 in and smaller1/4 in/ft1:482.08%
3 to 6 in1/8 in/ft1:961.04%
8 in and larger1/16 in/ft1:1920.52%
Step-by-Step MathFall = run × gradient
  1. Fall = slope × run = 0.25 in/ft × 40 ft = 10 in (254 mm).
  2. End invert = start 18 in + fall 10 in = 28 in; trench base = 28 in + bedding 4 in = 32 in.
  3. Manning full pipe: V = (1 ÷ 0.013) × (0.102 m ÷ 4)^(2/3) × √0.0208 = 0.959 m/s; Q = V × π × 0.102² ÷ 4 = 7.78 l/s.
  4. Result: 10 in Total Fall.
Set the End Invert 28 in Deep
The gradient meets IPC Table 704.1 for this pipe. Check the fall at each quarter point with a level or laser as you bed the pipe.

How the Soil Pipe Fall Calculator Works

Fall is the vertical drop of a pipe from one end to the other. Gradient is how much it drops for each unit of horizontal run. Multiply the two and you have the fall you need to build in.

Here F is the total fall, L the horizontal run and S the gradient as a fraction. A 40 ft building drain at 1/4 in per foot falls 40 × 0.25 = 10 in. A 12 m run at 1 in 80 falls 12,000 / 80 = 150 mm.

UK plans write gradient as "1 in X". To turn that into a fall in millimeters, multiply the run in meters by 1,000 and divide by X. That is the same formula, written the way a drainage drawing uses it.

The Soil Pipe Fall Calculator checks against IPC Table 704.1, Approved Document H Table 6 for UK drains, or Table 2 for above-ground waste branches. It has three modes. Total Fall takes a run and gradient. Check Gradient takes a run and a measured drop and returns the installed slope. Longest Run tells you how far a pipe can travel before it uses up the depth you have.

Most fall calculators stop at the drop. This one also gives the depth of the pipe invert at the far end, the trench depth with bedding, a staking sheet at quarter points and the full-pipe flow and velocity at your slope.

Gradient Ratios in mm per Meter and Inches per Foot

The same slope appears as a ratio, a percent, millimeters per meter or inches per foot depending on who drew the plan. This table converts the gradients used for soil pipes and drains, with the fall over two common run lengths.

Gradientmm per MeterInches per FootPercentFall Over 10 mFall Over 40 ft
1 in 4025.00.3002.50%250 mm12.0 in
1 in 48 (1/4 in/ft)20.80.2502.08%208 mm10.0 in
1 in 50 (2%)20.00.2402.00%200 mm9.6 in
1 in 6016.70.2001.67%167 mm8.0 in
1 in 8012.50.1501.25%125 mm6.0 in
1 in 96 (1/8 in/ft)10.40.1251.04%104 mm5.0 in
1 in 100 (1%)10.00.1201.00%100 mm4.8 in
1 in 1109.10.1090.91%91 mm4.4 in
1 in 1506.70.0800.67%67 mm3.2 in
1 in 192 (1/16 in/ft)5.20.0630.52%52 mm2.5 in
1 in 200 (0.5%)5.00.0600.50%50 mm2.4 in

A 1 in 40 fall per meter is 25 mm, since 1,000 / 40 = 25. A 1 in 60 fall is 16.7 mm per meter, and a 1 in 80 fall is 12.5 mm per meter. A 1% slope drops 10 mm per meter or 0.12 in per foot, while a 2% slope drops 20 mm per meter or 0.24 in per foot.

To go from a ratio to percent, divide 100 by X. To go from percent to a ratio, divide 100 by the percent, so 2% is 1 in 50 and 0.5% is 1 in 200. The gradient field in the Soil Pipe Fall Calculator takes any of these forms, plus degrees.

Minimum Soil Pipe Fall Under the IPC

In the US, horizontal drainage pipe follows the minimum slopes in Table 704.1 of the International Plumbing Code, Chapter 7. The minimum depends only on pipe size, so larger pipes may run flatter.

Pipe SizeMinimum SlopeRatioFull-Pipe VelocityFull-Pipe Capacity
1-1/2 in1/4 in/ft1:481.64 ft/s9.0 gpm
2 in1/4 in/ft1:481.98 ft/s19.4 gpm
2-1/2 in1/4 in/ft1:482.30 ft/s35.2 gpm
3 in1/8 in/ft1:961.84 ft/s40.5 gpm
4 in1/8 in/ft1:962.23 ft/s87.2 gpm
6 in1/8 in/ft1:962.92 ft/s257 gpm
8 in1/16 in/ft1:1922.50 ft/s391 gpm
10 in1/16 in/ft1:1922.90 ft/s710 gpm

Velocity and capacity come from Manning's equation with n = 0.013, the default in the Soil Pipe Fall Calculator. They show what code minimum really means for each size. A 4 in drain at 1/8 in/ft carries about 87 gpm full, while doubling the slope to 1/4 in/ft lifts it to 123 gpm.

Many plumbers lay 3 in and 4 in soil pipe at 1/4 in/ft anyway, where depth allows. A steeper pipe moves solids faster and leaves more margin if the trench settles. For drain lines past the building, the sewer line slope calculator covers longer runs, and the pipe slope calculator converts any run and drop into a pitch.

Minimum Soil Pipe Fall in the UK

UK foul drains follow Table 6 of Approved Document H. The flattest allowed gradient depends on the pipe bore, the peak flow and how many WCs feed the drain.

Peak FlowPipe BoreMinimum GradientFall per MeterMax CapacityCondition
Under 1 l/s75 mm1 in 4025 mm4.1 l/sNo WC
Under 1 l/s100 mm1 in 4025 mm9.2 l/sNone
Over 1 l/s75 mm1 in 8012.5 mm2.8 l/sNo WC
Over 1 l/s100 mm1 in 8012.5 mm6.3 l/sAt least 1 WC
Over 1 l/s150 mm1 in 1506.7 mm15.0 l/sAt least 5 WCs

Paragraph 2.33 of Approved Document H sets a 75 mm minimum bore for any foul drain and 100 mm for a drain that carries WC waste. So a 75 mm pipe is only for sinks, baths and showers, never a toilet.

The 1 in 80 row only applies with at least one WC connected, because a WC flush gives the surge that keeps a flatter pipe clean. Without a WC, keep a 100 mm drain at 1 in 40. A 150 mm drain needs at least five WCs before 1 in 150 is allowed.

110 mm soil pipe fall

A 110 mm soil pipe is the UK's 100 mm nominal drain, measured across the outside. Pick the 100 mm (110 mm OD) size in the Soil Pipe Fall Calculator, which uses the 100 mm row of Table 6. With a WC connected and peak flow over 1 l/s, the minimum is 1 in 80, which is 12.5 mm of fall in each meter.

Many installers lay 110 mm drains at 1 in 40 to 1 in 60 where the ground allows. That is 16.7 to 25 mm per meter. A 15 m run at 1 in 60 falls 250 mm, while the same run at 1 in 80 falls 188 mm.

Above-ground waste branches

Branch pipes from a basin or WC to the stack follow Table 2 of Approved Document H instead. Unlike the drain table, Table 2 sets a maximum fall as well as a minimum, because a branch that falls too steeply can siphon the water out of the trap. It also limits how far the branch can run without a vent.

BranchMin Pipe SizeMax AppliancesMax LengthFall per MeterRatio
WC, outlet over 80 mm100 mm815 m18 to 90 mm1:56 to 1:11
WC, outlet under 80 mm75 mm115 m18 to 90 mm1:56 to 1:11
Washbasin or bidet30 mm11.7 m18 to 22 mm1:56 to 1:45
Washbasin or bidet30 mm11.1 m18 to 44 mm1:56 to 1:23
Washbasin or bidet30 mm10.7 m18 to 87 mm1:56 to 1:11
Washbasin or bidet40 mm13 m18 to 44 mm1:56 to 1:23
Washbasins or bidets50 mm44 m18 to 44 mm1:56 to 1:23

Choose the Waste Branch option in the Soil Pipe Fall Calculator to check a branch against both limits and its maximum length. A 1.5 m basin branch in 30 mm pipe must fall 27 to 33 mm in total. If it ran 2 m, it would be past the 1.7 m unvented limit and need a vent pipe or an air admittance valve.

A footnote to Table 2 lets a WC branch drop to 9 mm per meter on long runs where space is tight, but only when more than one WC is connected. The calculator keeps the 18 mm per meter minimum, which suits a single WC.

Setting the Inverts and Trench Depth

The invert is the inside bottom of the pipe, where waste actually flows. Fall is measured invert to invert. Enter how deep the starting invert sits below ground and the Soil Pipe Fall Calculator gives the invert depth at the far end and the midpoint.

For the default 40 ft run at 1/4 in/ft, a start invert 18 in deep ends 28 in deep after 10 in of fall. With 4 in of bedding under the pipe, the trench base at the far end sits 32 in down. The staking sheet lists the same figures at each quarter of the run, so you can set grade boards or check with a laser as you lay.

Longest Run mode in the Soil Pipe Fall Calculator works the other way. If the sewer connection sits only 12 in lower than your start invert, a 4 in drain at 1/4 in/ft can travel 48 ft. At the 1/8 in/ft code minimum it can reach 96 ft. For bedding stone quantities in that trench, use the pipe bedding calculator.

Soil Pipe Fall by Size and Situation

A US plumber sizes the fall from pipe diameter alone, while a UK drain layer also needs the peak flow and the WC count. Each case that follows gives the fall in both millimeters and inches.

What is the correct fall for a soil pipe?

In the US, a 3 in or 4 in soil pipe needs at least 1/8 in per foot under IPC Table 704.1, and 1/4 in per foot is the common choice. In the UK, a 100 mm or 110 mm drain with a WC needs at least 1 in 80 (12.5 mm per meter), and 1 in 40 if no WC is connected and flow stays under 1 l/s.

What is the fall on a 4 inch soil pipe?

A 4 in soil pipe needs a minimum of 1/8 in per foot, which is 1 in 96 or 10.4 mm per meter. Over 40 ft that is 5 in of fall. At the more common 1/4 in per foot, the same 40 ft run falls 10 in.

How much fall should a 3 inch pipe have?

A 3 in drain falls at least 1/8 in per foot under the IPC. That gives 2.5 in over 20 ft. At 1/8 in/ft a full 3 in pipe moves about 1.84 ft/s, so many installers use 1/4 in/ft for short runs where depth is no problem.

What is the minimum slope for a 2 inch sewer pipe?

Pipe 2-1/2 in and smaller must fall at least 1/4 in per foot, or 1 in 48. A 2 in line 15 ft long needs 3.75 in of fall. That rule covers fixture branches for sinks, tubs and showers, which run at 2.08% or steeper.

What is the minimum fall for 100 mm and 110 mm drainage?

Approved Document H allows 1 in 80 for a 100 mm drain with at least one WC and peak flow over 1 l/s. Without a WC, use 1 in 40. A 110 mm pipe is the same drain sized by its outside diameter, so the same rule applies to it and to a 100 mm sewer pipe.

How much does a 110 mm pipe fall in 1 meter?

At 1 in 80, a 110 mm pipe falls 12.5 mm in each meter. At 1 in 60 it falls 16.7 mm, and at 1 in 40 it falls 25 mm. Over a 6 m run those become 75 mm, 100 mm and 150 mm of total fall.

What is the minimum gradient for a 150 mm sewage pipe?

Table 6 allows 1 in 150 for a 150 mm drain carrying at least five WCs, which is 6.7 mm per meter. In the US, a 6 in building sewer needs 1/8 in per foot, and 8 in and larger may drop to 1/16 in per foot.

What is the fall for a 50 mm waste pipe?

Above-ground branch waste pipes follow Table 2 of Approved Document H, not the drain table. A 50 mm branch serving up to four washbasins runs at 18 to 44 mm per meter over a branch up to 4 m long, or roughly 1 in 56 to 1 in 23. On a 3 m branch that is 54 to 132 mm of total fall.

What does 1 in 40 fall mean?

It means the pipe drops one unit for every 40 units it runs level. Over a meter, 1 in 40 is 25 mm of fall. Over 10 m it is 250 mm, and over 40 ft it is 12 in. As a percentage it is 2.5%.

How do you calculate a 1 in 60 fall?

Divide the run by 60. A 9 m run at 1 in 60 falls 9,000 / 60 = 150 mm. In millimeters per meter, 1 in 60 is 1,000 / 60 = 16.7 mm, so you can also multiply the run in meters by 16.7.

How do you calculate a 2% slope?

Multiply the run by 0.02. A 30 ft pipe at 2% falls 30 × 12 × 0.02 = 7.2 in, and a 5 m pipe falls 100 mm. A 2% slope is 0.24 in per foot, just under 1/4 in/ft, so it falls slightly short of the IPC minimum for 2-1/2 in and smaller pipe.

How much is a 1% slope in inches per foot?

A 1% slope falls 0.12 in per foot, close to the 1/8 in/ft (1.04%) minimum for 3 to 6 in pipe. In metric it is 10 mm per meter, the same as 1 in 100. A 0.5% slope is half that, at 0.06 in per foot or 5 mm per meter.

How do you measure pipe fall?

Measure the invert height at each end with a laser or level and subtract one from the other. On short runs, lay a 4 ft level on the pipe and lift the low end until the bubble centers. The gap under it is the fall over 4 ft, and a 1/2 in gap means 1/8 in per foot.

Enter the run and measured drop in the Soil Pipe Fall Calculator's Check Gradient mode to get the installed slope in every unit and see whether it meets the code. For other drain runs on the same job, the drainage fall calculator and French drain calculator cover the rest of the system.

Can a soil pipe be too steep?

Neither IPC Table 704.1 nor Approved Document H Table 6 sets a maximum gradient for a drain, and a steep drain rarely blocks. Above-ground waste branches are different, since Table 2 caps their fall to protect the trap seal. The real risks are a pipe laid too flat, or a run that sags and leaves a dip where solids settle. Keep the gradient even from end to end, and change it only at an access point or fitting.